伊人天堂Av无码Av日韩Av_国产偷窥熟女精品视频大全_成 人 黄 色 视频在线播放165_日韩高清在线中文字带字幕

Isolation switch operating mechanism control and introduction of secondary circuit

Time:2021/7/14Author:adminClick: 377
Precautions for operating the isolating switch

(1) Before operation, check that the circuit breaker (switch) is in the open position to prevent the isolation switch from being pulled and closed with load.

(2) A blocking device to prevent misoperation is installed between the knife switch, the grounding knife switch and the switch, and the switching operation must be carried out in sequence. If it is blocked and cannot be operated, the reason should be found out. Under normal circumstances, it cannot be unlocked at will.